04
How I work
The same four principles, from railway faults to AI agents.
-
Make it visible
You can’t fix what nobody can see.
- Network Rail
- On call for every electrification and plant fault, from dewirements to 650V cable faults.
- Amazon
- One checked list of every contractor on site.
- Studio
- Every agent task on one board, from opened to released.
-
Standardise it
Good work should not depend on who is on shift.
- Network Rail
- Updated national electrical safety standards (NR/L3/ELP/29987 and 25000).
- Amazon
- A contractor process sites adopted as best practice.
- Studio
- The same checks on every change, every time.
-
Check it independently
Nobody signs off their own work.
- Network Rail
- The engineer formally authorised to isolate and hand over electrical equipment for work. for overhead lines and distribution, and technical audits.
- Amazon
- Site safety audits, and investigations to root cause.
- Studio
- Reviewer agents sent work back 785 times before it shipped.
-
Grow the people
Teams outlast any one person.
- Network Rail
- Managed a team of 4 and 7 apprentices.
- Amazon
- Led a shift of 20 engineers.
- Studio
- Taught myself the tools, then built a team of 16 agent roles around them.
