Kieran Clarke. I make difficult things easy for teams: engineering, operations and AI.
Now helping teams use AI to do more, safely.
Range
- Power and electrificationOverhead line electrification, and London Overground’s 750V A live rail beside the track that powers trains; 750V DC on London Overground..
- Safety and assuranceInvestigations to root cause, Isolating a machine’s energy and locking it off before anyone works on it., audits up 30% year on year.
- Operations leadershipA shift of 20 engineers at a site shipping 500,000+ packages a day.
- Systems and processUpdated Network Rail’s national electrical safety standards.
- AI and productIndependent checks and human sign-off on everything the agents ship.
Contents
- 01 Founder Jun 2025 to presentSolo founder, designing, building and running products with a team of AI agents.
- 02 Amazon Sep 2022 to Apr 2025Contractor management, incident investigations and lockout-tagout across 7 sites.
- 03 Network Rail 2015 to 2016, Sep 2017 to Sep 2022On call for overhead line, third rail and plant faults on the lines out of London Euston.
- 04 How I work Rail, Amazon and the studioFour principles, from railway faults to AI agents.
- 05 About Education and outside workFirst Class Honours, the IET Prize, and how to reach me.