On-call engineer for all electrification and plant issues.
- Year in Industry, Electrification & Plant (E&P)Preston · 2015 to 2016
- Graduate Electrical EngineerThe Quadrant HQ, Milton Keynes · Sep 2017 to May 2019
- Principal Technical Officer, Electrification & PlantEuston Delivery Unit, London · May 2019 to Sep 2022
On call
- Faults
- Overhead line dewirements (the overhead wire brought down) and 650V cable faults (the cables that power the signalling), each traced to root cause.
Storm repairs. Adverse weather brought trees down onto the line. I planned and oversaw the repairs.
The wires
- Overhead line and A live rail beside the track that powers trains; 750V DC on London Overground.
- Technical assurance, compliance and auditing for 25,000V overhead line electrification and plant, and London Overground’s 750V DC third rail, supporting the technical authority, asset management and front-line staff.
- Power
- Signalling power supplies and plant, working with the distribution network operators (DNOs).
- Lighting
- A £0.5M lighting project, delivered on time and on budget.
- Safety standard
- Rewrote an electrical safety standard to align with the Electricity at Work Regulations 1989, after a Safety Improvement Notice, an enforcement notice from the regulator.
The people
- Technical office
- Ran the E&P technical office as deputy to the engineering and section managers, coordinating multi-disciplinary tasks across teams.
- Team
- Managed a team of 4 and 7 apprentices, and supported the maintenance teams on the ground and in the office.